All news
Entity

iXBT

organization

iXBT.com — веб-сайт, русскоязычное интернет-издание о компьютерной технике, смартфонах, гаджетах, автомобилях, космосе, информационных технологиях и программных продуктах. На сайте публикуются новости IT-индустрии, статьи с обзорами, тесты компьютерных комплектующих и программного обеспечения. У сайта есть несколько проектов, таких как «Конференция IXBT», платформа с UGC-контентом «Блоги IXBT Live», портал об играх «IXBT Games» и другие.

Mentions: 20 · Sources: 8 · Days: 18 · Oct 9, 2026 — Nov 29, 2026

Founded
1997
Website
https://www.ixbt.com

Text: Wikipedia (CC BY-SA) · Data: Wikidata (CC0)

Mentions in stories

Export control for SI chips is shifting from the point of sale to monitoring where they are actually deployed in cloud infrastructure.

Nvidia requires new cloud partners in Southeast Asia to track chip locations

Export control for SI chips is shifting from the point of sale to monitoring where they are actually deployed in cloud infrastructure.

According to Bloomberg, as relayed by iXBT, Southeast Asian cloud providers seeking Nvidia Cloud Partner status must enroll in the Fleet Intelligence program. It uses GPU telemetry and network latency to estimate equipment location and condition. Nvidia intends this to hinder illegal resales of advanced accelerators to China. Outside the new partner requirement, participation remains voluntary, and the system does not automatically send equipment coordinates to the manufacturer.

South Korean customers are getting an alternative to Nvidia accelerators, and Huawei is entering a new export market.

Huawei begins commercial shipments of Ascend SI accelerators to South Korea

South Korean customers are getting an alternative to Nvidia accelerators, and Huawei is entering a new export market.

Huawei has begun shipping to South Korea the Ascend 950PR SI accelerator for inference, the Ascend 950DT for training and the Atlas 950 computing system. The company has moved its SI lineup's overseas expansion from preparation to commercial sales. To enter the market, the company signed agreements with distributors in advance and prepared technical training, pricing and local marketing. SK Shieldus is named among the partners; the products are positioned as an alternative to Nvidia accelerators. According to DigiTimes, as relayed by iXBT.

Sources 1

This is an announcement of a talk at ISSCC 2027, not a product launch: Huawei's memory specs are known only from the talk title in the conference program.

Huawei has HBM memory talk with 4096-bit bus on the ISSCC 2027 program

This is an announcement of a talk at ISSCC 2027, not a product launch: Huawei's memory specs are known only from the talk title in the conference program.

In the preliminary ISSCC 2027 program published by IEEE, Huawei has four talks. One of them is "A 64-Channel 4096-DQ Custom HBM with Memory Controllers and 5-Layer Wafer-on-Wafer Hybrid Bonding": it covers 64 channels and 4096 DQ interfaces versus 2048 for HBM4 and 1024 for HBM3E, built-in memory controllers and hybrid bonding of five wafers wafer-to-wafer instead of TSV. The talk by the Shenzhen team is scheduled for February 16, 2027; ISSCC 2027 itself will run February 14–18 in San Francisco. Citing the roadmap, iXBT writes that the Ascend 960 accelerator (expected in Q1 2027) will get 288 GB of its own HBM with 9.6 TB/s of bandwidth. For comparison, Nvidia's Blackwell-based B300 is listed at 8 TB/s, and Ascend 970 at up to 14.4 TB/s. The already shipping Ascend 950PR and 950DT have 128 GB (HiBL 1.0, 1.6 TB/s) and 144 GB (HiZQ 2.0, 4 TB/s).

Within a major SI group, resources are shifting from video generation to working agents, whose business value is easier to measure.

SpaceX cuts 60 Grok Imagine developers, leaving a small support team

Within a major SI group, resources are shifting from video generation to working agents, whose business value is easier to measure.

According to The Information, as relayed by iXBT, SpaceX laid off 60 employees from the Grok Imagine division within SpaceX Super Intelligence over the past week. The service remains operational, supported by a small remaining team. The staffing decision followed the merger of xAI and Anysphere under SpaceX and a shift in priority toward programming tools and agents; the company has not announced that Grok Imagine is closing.

Sources 1

The statement marks the next development stage for a visual interface; medical clearance remains essential.

Musk says Blindsight vision implant is engineering-ready

The statement marks the next development stage for a visual interface; medical clearance remains essential.

In an October 30 post, Neuralink’s head said the device is ready from an engineering standpoint and awaiting regulatory approval, iXBT reports. He describes Blindsight as the company’s second product, intended to include people who are completely blind or have never had sight.

Sources 1

Google and MediaTek have not officially confirmed the project, so 512 GB per chip remains an analyst estimate rather than a stated accelerator specification.

iXBT: Google preparing TPU v10t with up to 512 GB of memory per chip, analysts estimate

Google and MediaTek have not officially confirmed the project, so 512 GB per chip remains an analyst estimate rather than a stated accelerator specification.

Google is developing a special version of HBM5 memory for the tenth generation of TPU, iXBT reported on November 29, citing the South Korean outlet Economy Tribune. According to industry analysts' estimates, memory capacity could reach 512 GB per chip, which would allow more data from large models to be kept in the accelerator itself. Taiwan's MediaTek is seen as the main candidate for the SerDes interface and the HBM5 base die. Intel's EMIB-T technology is planned for packaging — reportedly starting with the ninth generation of TPU, developed with MediaTek's involvement. The tenth generation carries the designation TPU v10t in the roadmap: one forecast points to the fourth quarter of 2028, other estimates to mass production in 2029. Neither Google nor MediaTek has officially confirmed the specifications or the division of work.

Sources 1

A Russian browser is gaining audience along with its SI features, per the company's own data.

Yandex Browser tops 100 million monthly active devices for the first time: 104 million in September, 46 million people use its SI features

A Russian browser is gaining audience along with its SI features, per the company's own data.

As Yandex reported (relayed by iXBT), the monthly audience of Yandex Browser exceeded 100 million active devices for the first time in September and reached 104 million; since the start of the third quarter the figure has grown by 9 million. The number of users of Alice AI and other built-in SI features of the browser grew by almost 40% over the quarter, to 46 million people.

Sources 1

The Russian experiment tests whether a robot can work in space in place of a person, operated from on board.

Teledroid experiment being prepared on the ISS: a humanoid robot to be driven by cosmonauts copying their movements

The Russian experiment tests whether a robot can work in space in place of a person, operated from on board.

According to iXBT, a Roscosmos project is testing a humanoid, remotely operated robot: cosmonauts pass their movements to it through a motion-copying device — the operator's workstation — and the robot can carry out some operations autonomously. Pyotr Dubrov and Anna Kikina are preparing the equipment on the station; the set includes the motion-copying device, a computing module, the robot itself and an external camera, and part of the hardware was delivered in September on the Progress MS-35 cargo ship. Test stages: checking control of a virtual model, testing the robot inside the station, testing on the outer surface, and practicing operations with tools and equipment in remote and autonomous modes.

Sources 1

Data centers in Russia are now designed with protection against aerial attacks in mind, and this will add to their cost.

Russia's Ministry of Digital Development approves requirements for protecting data centers from drones: strategic ones are proposed to be placed underground

Data centers in Russia are now designed with protection against aerial attacks in mind, and this will add to their cost.

According to iXBT and vc.ru, citing Kommersant, an industry committee of Russia's Ministry of Digital Development approved requirements for protecting data centers from drones; they apply to planned, under-construction and operating data centers regardless of ownership. Data centers are split into three categories: underground shelters are preferred for strategic ones, reinforced above-ground buildings are allowed for the second category, and ordinary ones for corporate facilities. Measures include reinforcing buildings, electronic warfare and air defense, service redundancy, and coordination with defense and security agencies; for operating sites, reducing visibility from the air. Market participants quoted by iXBT say the cost of protection could raise service prices by about 10% excluding inflation.

Former nuclear sites could give data centers ready-made grids and water, but for now it is only an assessment of feasibility.

PreussenElektra and Nvidia assess whether sites of former German nuclear plants could become data centers

Former nuclear sites could give data centers ready-made grids and water, but for now it is only an assessment of feasibility.

According to Bloomberg, the German energy company PreussenElektra said it is working with Nvidia to assess whether sites of closed nuclear plants could be turned into data centers, without giving details. According to iXBT, citing Tom's Hardware, the agreement dates from October 21; the idea is to reuse power grids, water supply and engineering infrastructure, not to restart reactors; specific sites, the amount and a plan have not yet been named.

Showing the latest 10 of 20 mentions; the rest are in the daily feed.