All news
Entity

GB200

product

Blackwell is a graphics processing unit (GPU) microarchitecture developed by Nvidia as the successor to the Hopper and Ada Lovelace microarchitectures.

Mentions: 2 · Sources: 3 · Days: 2 · Sep 28, 2026 — Oct 16, 2026

Text: Wikipedia (CC BY-SA) · Data: Wikidata (CC0)

Mentions in stories

Microsoft showed that it trained its own base model at the 2.8-trillion-parameter scale, but for now it is unavailable.

Microsoft completes pre-training of MAI-Base-2: 2.8 trillion parameters, weights not yet released

Microsoft showed that it trained its own base model at the 2.8-trillion-parameter scale, but for now it is unavailable.

According to Microsoft's description, MAI-Base-2 is a mixture-of-experts model with 2.8 trillion parameters, 80 billion of them active, with images handled in a built-in architecture without a separate encoder. Training on 50 trillion tokens took 38 days on 16,000 GB200 GPUs (August-September 2026). The company claims the model is 4-12 times more efficient in pre-training cost than the strongest open base model, DeepSeek-V4-Pro-Base, and beats the open models tested on held-out evaluations — these are Microsoft's own figures. Post-training is under way; the weights have not been published, and licensing is planned through Foundry.

Sources 1

Computing power for SI is doubling in a matter of months: the foundation for the next generations of models is already being poured.

Musk: Colossus 2 in Memphis could more than double by year-end to 1.2 million Nvidia chips

Computing power for SI is doubling in a matter of months: the foundation for the next generations of models is already being poured.

The cluster currently has about 550 thousand Nvidia GB200 and GB300 accelerators. According to Musk, another roughly 220 thousand GB300s will come online within a week, the same number in November, and a third batch by the end of December, "if we're lucky". Together with the neighboring Colossus 1, the Memphis site will approach 1.44 million accelerators; this is the most detailed expansion timeline Musk has given publicly. Caveats: chip deliveries and the supply of electricity and cooling could shift the schedule.