All news
Entity

Microsoft

company

Microsoft Corporation is an American multinational technology conglomerate headquartered in Redmond, Washington. The company became influential in the rise of personal computers through software like Windows and has since expanded into areas such as Internet services, cloud computing, artificial intelligence, and video gaming, among others. A Big Tech company, Microsoft is the largest software company by revenue, one of the most valuable public companies, and one of the most valuable brands globally.

Mentions: 103 · Sources: 90 · Days: 57 · Sep 27, 2026 — Nov 27, 2026

Founded
1975
Website
https://www.microsoft.com/, https://www.microsoft.com/en-gb, https://www.microsoft.com/de-de/, https://www.microsoft.com/ja-jp/
Headquarters
Redmond
Founders
Bill Gates, Paul Allen
CEO
Steve Ballmer, Bill Gates, Satya Nadella

Text: Wikipedia (CC BY-SA) · Data: Wikidata (CC0)

Attacks via the ARTEX agent framework

A ready-made open framework with SI agents let a state-linked group run mass attacks and cut the time to cloud access to hours.

Microsoft: China-linked group Storm-0940 used SI agents of the ARTEX framework to breach a ConnectWise application and gained cloud access within hours

A ready-made open framework with SI agents let a state-linked group run mass attacks and cut the time to cloud access to hours.

According to Microsoft, the group Storm-0940, which the company describes as aligned with the Chinese state, has since September used ARTEX — an open-source multi-agent penetration-testing framework that works with any SI model — to attack hundreds of organizations across industries, from aerospace and defense to finance and government. Microsoft holds the group responsible for the recently disclosed compromise of the multi-tenant ConnectWise Cloud Backup application: using stolen application credentials, the agents scanned networks, guessed passwords and abused permissions in Microsoft 365 environments without an interactive user sign-in. In several cases less than three hours passed from selecting a target to privileged cloud access. According to The Next Web, sign-in attempts were made against more than 2,250 Microsoft 365 tenants, Huntress confirmed breaches at 162, and the rate reached 2,900 sign-in attempts per minute. Microsoft stresses that no vulnerabilities in its products were used, most of the attacks failed, and the presence of an affected application does not mean data was stolen.

Deleting the source code from GitHub did not stop ARTEX from spreading: copies and a commercial version remain available, and groups from China and North Korea as well as criminals are already using the framework.

Microsoft: China- and North Korea-linked groups automate attacks via ARTEX

Deleting the source code from GitHub did not stop ARTEX from spreading: copies and a commercial version remain available, and groups from China and North Korea as well as criminals are already using the framework.

Microsoft Threat Intelligence has published an analysis of the ARTEX SI framework, which automates cyberattacks from reconnaissance to data theft. According to Microsoft, groups linked to China and North Korea, including Salt Typhoon, Crystal Typhoon, Onyx Sleet and Storm-0940, have integrated ARTEX into their operations. Financially motivated criminals also use the tool. The source code was published in July by a GitHub user under the alias Autumn-27; he deleted it in October, but copies continue to be distributed by other developers. Chinese cybersecurity firm ThreatBook sells a commercial Pro version. ARTEX is built on a multi-agent architecture: a planner distributes tasks to executor agents. These use Nmap, Sqlmap, Metasploit and headless browsers and can connect any large language models, including models without safety restrictions. In one case, according to Microsoft, an agent found credentials on GitHub in five minutes and pulled data out of Azure Key Vault.

Global Microsoft Outlook, Teams and Copilot outage

The simultaneous failure of email, workplace collaboration and Copilot again demonstrated organizations' dependence on Microsoft's unified cloud infrastructure.

Microsoft outage disrupts Outlook, Teams and Copilot

The simultaneous failure of email, workplace collaboration and Copilot again demonstrated organizations' dependence on Microsoft's unified cloud infrastructure.

Users in the Americas reported problems signing in to Exchange Online, sending and receiving email, and disruptions to Teams, Copilot and other Microsoft 365 tools. At its peak, Downdetector received more than 130,000 reports about Outlook, more than 46,000 about Microsoft 365 and about 3,000 about Teams. These figures reflect the number of reports, not the exact number of people affected. Microsoft identified unusually high load on part of its infrastructure as a possible cause and began redistributing traffic to restore connections. The company had earlier declared a separate Teams outage in North America resolved, although some users continued to report problems.

European protests against large data centers

Opposition to new computing capacity has escalated into direct intervention at a construction site, making energy use and urban restrictions part of SI infrastructure timelines.

Protesters enter Microsoft data center construction site in Amsterdam

Opposition to new computing capacity has escalated into direct intervention at a construction site, making energy use and urban restrictions part of SI infrastructure timelines.

About 100 demonstrators entered the site in the Sloterdijk district, and some climbed a construction crane. Police ended the demonstration on the mayor's orders, and several arrests were reported. Geef Tegengas and Fossielvrij NL organised the protest against three 85-metre towers that Pure Data Centres is building for Microsoft in an investment exceeding $1 billion. Expected electricity consumption and the project's impact on housing plans were among the stated concerns. The project received approval before the city's current restriction on new data centers through 2030.

The growth of SI infrastructure increasingly depends on local communities' consent and projects' ability to limit their use of shared resources.

More than 100 groups in 15 European countries will hold actions calling for a moratorium on large data centers

The growth of SI infrastructure increasingly depends on local communities' consent and projects' ability to limit their use of shared resources.

The Stop Dirty Data Centres campaign has brought together environmental, digital-rights and civil organisations for two days of action on 6–7 November. Plans include a demonstration outside the Polish parliament, a march in Dublin, an action at a Microsoft data center in Denmark and public teach-ins near a site in Amsterdam. Participants are calling for a moratorium on large projects until clearer rules exist, citing pressure on power grids, water, land, housing and the cost of living. According to a PwC estimate cited by Euronews, annual investment in European data centers rose from €12 billion in 2020 to €25–26 billion in 2026 and could total €176 billion from 2026 through 2031. Industry representatives point to jobs and economic growth from constructing and operating such facilities.

Other mentions

The banks took the option in full, so including the private sale of Class N shares Anthropic raised $119.5 billion before expenses.

Anthropic pulls in another $12.2 billion from option, lifting IPO to record $93.5 billion

The banks took the option in full, so including the private sale of Class N shares Anthropic raised $119.5 billion before expenses.

Anthropic's underwriters exercised the greenshoe option: another 147 million Class A shares were sold. That brought in $12.2 billion and lifted the IPO to $93.5 billion — larger than SpaceX's June offering. In total, 1,127,000,000 Class A shares were sold at $83; 980 million on the main day, the rest under the option. At the same time, a private sale of Class N shares worth $26 billion closed at the IPO price with participation from AMD, Google, Microsoft and Nvidia. Including the private placement, total proceeds came to $119.5 billion before expenses. Anthropic shares closed Thursday at $97.17 and fell 12% in Friday premarket trading amid a selloff in tech stocks.

Sources 1

The sell-off hit recent SI listings: a week after its IPO, Anthropic's shares were already below their offering price.

Nasdaq falls 4.15%, Nvidia 8.6% amid SI stock sell-off

The sell-off hit recent SI listings: a week after its IPO, Anthropic's shares were already below their offering price.

US indices fell sharply in trading on November 25. The Nasdaq Composite was down 4.15% at 22,747.61, the S&P 500 lost 2.86% to 6,995.20, and the Dow fell 1.99% (minus 995.52 points) to 49,023.18. Chipmakers led the decline: Nvidia down 8.6%, the Philadelphia Semiconductor index down 5.8%. Among tech companies, Alphabet fell 5%, Amazon 4.9%, Microsoft 3.2%, and Dell 5.4% even after raising its guidance. Anthropic, which listed a week earlier, closed on November 24 at $81.90 — below its $83 IPO price — and dropped a further 8.2%. Among the reasons, Reuters cites doubts about the payback on debt financing of SI infrastructure and rising interest rates. US GDP grew 4.3% in Q3 with core PCE at 3.3% year on year; in addition, the US proposed tariffs against 14 trading partners.

Companies keep ramping up spending on SI infrastructure despite the sector's re-rating: $1.8 trillion in 2026 is nearly equal to the previous four years' spending.

Nasdaq 100 loses 10.4% in a week — worst since the Covid-19 crisis

Companies keep ramping up spending on SI infrastructure despite the sector's re-rating: $1.8 trillion in 2026 is nearly equal to the previous four years' spending.

The Nasdaq 100 ended the week down 10.4% — the worst week for US tech stocks since the Covid-19 crisis. The cause was investors' doubts about returns on hundreds of billions of dollars of spending on SI infrastructure. Amazon fell 4.10% on Friday and closed at $246.82 with a market capitalization of about $2.67 trillion, though the stock is still up almost 9% since the start of the year. According to the Waikato Times, Amazon, Alphabet, Microsoft, Meta and Oracle spent $1.8 trillion on SI cloud — nearly as much in 2026 alone as in the previous four years combined. The sell-off is unfolding alongside Anthropic's share offering and talks on new large deals, including Amazon–Decart for about $7.5 billion.

Vera Rubin NVL72 is available through Azure in preview, while other NVIDIA platforms — RTX PRO 6000 Blackwell, Jetson Thor/Orin and Nemotron models in Foundry Local — are coming to on-premises environments.

Vera Rubin NVL72 goes live in Azure as NVIDIA pushes to Windows PCs

Vera Rubin NVL72 is available through Azure in preview, while other NVIDIA platforms — RTX PRO 6000 Blackwell, Jetson Thor/Orin and Nemotron models in Foundry Local — are coming to on-premises environments.

NVIDIA Vera Rubin NVL72 systems are already running in Azure data centers, and access to Azure virtual machines built on them is expanding in preview. NVIDIA and Microsoft announced this at the Ignite conference on November 19, extending their collaboration from data centers to Windows PCs. In Microsoft Foundry, the lineup of open NVIDIA Nemotron 3.5 models has been expanded: Super for long-running agents, Lightning for fast responses and tool calling. Bolt and Transcribe are listed as "coming soon." Azure Local will get RTX PRO 6000 Blackwell GPUs and the Jetson Thor and Jetson Orin platforms, while Foundry Local will get Nemotron 3.5 and Cosmos models. For Windows 365 Cloud PC, Direct Stream was announced with support for up to two 4K streams at 60 frames per second (limited preview, public preview in early 2027). The companies are also working to extend confidential computing to servers without virtualization and to rack-scale SI systems. According to EY, moving to Nemotron raised accuracy by 55% and cut cost 15-fold compared with proprietary frontier models.

The race for SI infrastructure has for the first time publicly shifted a major company's climate commitments: the cost of computing is now measured in emissions too.

Meta revisits its 2030 net zero target over SI data center emissions

The race for SI infrastructure has for the first time publicly shifted a major company's climate commitments: the cost of computing is now measured in emissions too.

In its 2026 sustainability report, Meta said it is revisiting the timeline and interim targets for reaching net zero emissions by 2030. Vice President of Data Centers Rachel Peterson and head of net zero Blair Swedeen attributed this to demand for SI infrastructure growing faster than forecast. The company's emissions rose from 15.6 million tonnes of CO2 equivalent in 2024 to more than 21.7 million tonnes in 2025 — nearly 40%. That is the largest increase among the four biggest US technology companies: Microsoft's was 25%, Google's 18% and Amazon's 16%. Meta attributes the bulk of it to capital goods, including data center servers. The company promises to keep its long-term ambitions and transparency, but the specific deadlines and emissions intensity targets will be revised. The report was published on November 19.

The fund has grown its capital for data center construction, but a third of its stated $30 billion target remains.

GIP raises about $20 billion for SI infrastructure partnership against $30 billion target

The fund has grown its capital for data center construction, but a third of its stated $30 billion target remains.

GIP's open SI infrastructure partnership has raised about $20 billion — two-thirds of its $30 billion target capital. In January, $12.5 billion had been reported, according to Dakota Private Markets. The partnership was created in September 2024 by BlackRock, GIP and MGX with funding and technical expertise from Microsoft; in March 2025 Nvidia and xAI joined it. The funds go to data centers and supporting energy infrastructure; including debt financing, the partnership has said it could mobilize up to $100 billion. The figures are cited from a secondary report.

Sources 1

The claimed 2–3x advantages in inference per watt and per dollar will only begin to be tested in practice when the first site launches in December 2026.

Marlowe raises $277M seed at $1.15B valuation for inference data centers

The claimed 2–3x advantages in inference per watt and per dollar will only begin to be tested in practice when the first site launches in December 2026.

Founded in May 2026, Marlowe (Bellevue, Washington; about 30 employees) announced a $277 million seed round at a $1.15 billion valuation on November 23. Accel led, with Bessemer, Altimeter, Atreides and Valor participating, along with the Collison brothers' fund and angels Henry Kravis, Dara Khosrowshahi and Aaron Levie. The company is building — and will itself operate — data centers tailored to inference on chips from AMD and startup Etched (networking by Broadcom). It promises 2–3x more inference per watt and per dollar through end-to-end tuning of the stack; these figures are the company's own claims and have not been independently verified. The first site, on Etched chips, launches in December 2026 and will mainly serve a large SI company that builds coding agents. The second, on AMD Helios racks, follows in Q2 2027; three customer agreements have been signed. The co-founders are CEO Dan Lewis (co-founder of Convoy) and CTO Kutta Srinivasan (previously technical lead for SI infrastructure at Microsoft).

JERA has a standard data center design with Dell and RHAELM, but with the hyperscalers it is still only in talks — no agreements have been signed.

JERA in talks with Anthropic, Meta, Amazon and Google on data centers at its Japanese power plants

JERA has a standard data center design with Dell and RHAELM, but with the hyperscalers it is still only in talks — no agreements have been signed.

Japan's largest power generator JERA is in talks with Anthropic, Meta and other US companies about data centers next to its power plants in the Tokyo area. Nikkei reported the talks on November 27. JERA global chief executive and chairman Yukio Kani also named Amazon, Microsoft and Google in an interview. According to him, the company intends to replicate "standard models" of data centers at several thermal power plants; JERA has more than 20 thermal power plants with a combined capacity of almost 55 GW. In October, JERA signed a memorandum with Dell Technologies and UK developer RHAELM to create a standardized SI infrastructure model. The first project is to be a hyperscale data center in Chiba with up to 400 MW of capacity, costing more than $15 billion and launching around 2028. According to a JERA representative, RHAELM is handling marketing for the project. No agreements have been reached yet — these are talks. Anthropic, Meta, Amazon, Microsoft and Google did not respond to Reuters requests for comment.

Ordinary PCs with USB4 will be able to form a cluster and run models that do not fit in one machine's memory, but for now this is a developer preview with manual configuration.

Microsoft opens preview of RDMA over USB4 for a cluster of Windows 11 PCs

Ordinary PCs with USB4 will be able to form a cluster and run models that do not fit in one machine's memory, but for now this is a developer preview with manual configuration.

Microsoft has introduced an extension to the USB4 Peer-to-Peer Networking feature built into Windows 11 — RDMA over USB4 (USB4NET). It allows several PCs to be linked and to access another node's RAM with low latency, so as to run a model that does not fit in a single machine's memory. A modified USB4 driver and NetworkDirect Provider have been published on GitHub as a Developer Preview, along with an adapted version of llama.cpp for distributing the load. The feature itself will appear in future Windows 11 builds; manual configuration is currently required. According to Microsoft, AMD and Intel have already run successful cluster tests on the Qwen3-235B-A22B and GPT-OSS-120B models. A minimum of USB4 40 Gbps is recommended, and Thunderbolt 4 also works; more than two nodes require a full-mesh topology. On a Mac with Thunderbolt 5, RDMA is available from macOS 26.2.

Sources 1

Agents built into operating systems have forced apps to look for technical ways to keep conversations in their own hands: for screenshots Signal has found one, for files on the device it has not.

Signal restricts screenshots so Gemini and Siri AI agents can't read chats

Agents built into operating systems have forced apps to look for technical ways to keep conversations in their own hands: for screenshots Signal has found one, for files on the device it has not.

Signal is restricting screenshot-taking in its app. On iOS 27 a "Block Siri AI" setting has appeared, enabled by default. On Android, Screen security mode turns on automatically when the system detects an attempt by an SI assistant to read the screen. Company president Meredith Whittaker explained the measure by agentic features built into the operating systems — Gemini Intelligence (Google) and Onscreen Awareness in Siri AI (Apple). According to her, they scan the screen and take Signal's content outside the app's control; Whittaker called this "an existential threat to Signal". The protection is incomplete: it does not stop agents from reading files on the device and cannot be implemented on macOS, where Signal recommends adding the app to Excluded Apps in Siri settings. Signal has demanded that Apple, Google and Microsoft give developers a documented way to opt out of SI access to app data and technical specifications for how agents work. Meta responded to Reuters that agents need to see the user's computer, and that its Muse agent accesses other apps only with explicitly granted permissions.

Showing the latest 15 of 103 mentions; the rest are in the daily feed.